Interior Design Project Sequence
From Design to Key Handover
Office use only
Stage 1 – Client Onboarding & Project Initiation
Client Requirement Briefing
The structured process of understanding the client’s needs, lifestyle, functional requirements, budget, timeline, and expectations before any design work begins.
Scope of Work
Client Profile & Usage
- Family size & lifestyle
- Daily routines
- Work-from-home needs
- Storage requirements
- Special needs
Space Requirements
- Bedrooms
- Living & dining preferences
- Kitchen type
- Utility areas
- Pooja room
- Study / home office
- Entertainment zones
- Parking
Functional Preferences
- Cooking habits
- Lighting preferences
- Smart home interest
- Indoor plants / water features
- Vaastu requirements
Aesthetic Preferences
- Design styles
- Colour preferences
- Material likes/dislikes
- Reference images
Budget & Timeline Inputs
- Overall budget range
- Priority spending areas
- Target move-in date
- Site constraints
Deliverables
- Client brief document
- Space program
- Budget confirmation
- Design direction notes
Stage 2 – BIM-Based Design & Client Approval
- Integrated concept design
- 3D BIM interior modelling
- Photo-realistic rendering
- Virtual walkthrough
- Design review & refinement
- Formal client sign-off
Deliverables
- Final layout plans
- BIM model snapshots
- Rendered images
- Walkthrough link
- Approval records
Planning, Engineering, Calculations & Selection
- Material & finish planning
- Lighting design & lux calculations
- Electrical load calculations
- Plumbing & HVAC design
- Security, automation & AV design
- Partition & staircase engineering
- Indoor garden & water body engineering
- BIM clash detection & coordination
Deliverables
- Material schedules
- System calculation reports
- Updated BIM model
- Pre-BOQ & costing inputs
Working Drawings, BOQ & Execution Approval
- Joinery & furniture shop drawings
- Ceiling & lighting layouts
- Flooring & tile layouts
- MEP drawings
- Security & automation drawings
- Decorative & soft furnishing layouts
BOQ & Final Costing
- Material & labour costing
- Taxes & contingency
- Payment milestones
Final Client Approval
- Signed execution approval
- Issued-for-construction drawings
- Approved BOQ
- Confirmed start date
Stage 3 – Site Execution, Testing & Key Handover
Execution
- Civil works & waterproofing
- Services installation
- False ceiling & finishes
- Joinery & furniture
- Final fittings
Testing & Quality Control
- Electrical, plumbing & HVAC testing
- Automation & AV testing
- Lighting verification
- Snag rectification
Handover
- Deep cleaning
- As-built drawings & BIM model
- Client training
- Warranty handover
- Final key handover
Status: READY TO ENJOY